The rehabbing of the bridge will take place over the next five months, and that means a lane reduction to both directions of traffic between Erato and Tulane.
from WWL - Local
The rehabbing of the bridge will take place over the next five months, and that means a lane reduction to both directions of traffic between Erato and Tulane.
0 Comments:
Post a Comment